On-site and corporate engineering offices for prompt and knowledgeable handling of customer technical service requirements and custom design
Responsible Management
Fully secure, 24-hour manned facility with accredited emergency response capabilities including standby personnel and contractor equipment and manpower
Consistent performance records in regional drills with the EPA and U.S. Coast Guard
Access
Highway access: 3 miles west of I-10 at exit 177. Three truck loading racks provide a total of ten truck-loading /unloading bays. All trucks are loaded via mass-flow meters. Two electronic scales, capable to read axle weights, are located at the site
Rail access: connected to Canadian National and Illinois Central rail system. Three rail car loading racks are currently in place under which a total of 14 rail cars can be loaded simultaneously. All rail cars are loaded via mass-flow meters
The marine dock is equipped with three barge berths. Two of the barge berths double as a ship berth. Maximum draft is 39 ft. and max LOA is 700 ft.